1. “Yao Yilin Says That for the Time Being China Will Not Consider Starting the Three Gorges Project Immediately,” Zhongguo Tongxun She, 23 January 1989.

2. Edward Goldsmith and Nicholas Hildyard, The Social and Environmental Effects of Large Dams, (San Francisco: Sierra Club Books, 1984), p. xi.

3. CIPM Yangtze Joint Venture (CYJV), Three Gorges Project Water Control Project Feasibility Study, Vol. 1, p. 16-12.

Appendix B

On September 17, 1990, Probe International filed complaints against British Columbia Hydro International, Hydro-Québec International, SNC, Lavalin International, and Acres International for their work on the Three Gorges Water Control Project Feasibility Study. The complaints were filed with the regulatory bodies that are legally responsible for regulating the profession of engineering in the provinces of British Columbia, Quebec, and Ontario.

Appendix A

1. The population subject to resettlement should, at a minimum, maintain its current standard of living and should have the opportunity to achieve a higher standard of living after resettlement has taken place.

2. The resettlement transition period should be minimized and adequate support of both a social and economic nature should be provided during the transition period.