(March 27, 1988) The following are links to PDF files containing the full text of each section of the Three Gorges Water Control Project Feasibility Study. These links redirect to our Chinese Probe International website.
Volume 1: Feasibility Study
Volume 1: Appendix A Feasiblity Study
Financial Analysis
Flood Control:
Comprehensive Planning and Water Levels:
Power Systems:
Construction:
Ecology and Environment:
Resettlement:
Electrical Equipment:
Shipping:
Hydrology:
Sediment and Siltation:
Main Hydraulic Structures:
Geology and Earthquakes:
Economic Evaluation (originally there were four sections in this chapter but two of them are missing)
List of Members of the Leading Group for Feasibility Study:
Categories: Three Gorges Probe


