Resettlement Plans for China’s Three Gorges Dam
by Philip M. Fearnside, Ph.D.
The Three Gorges Project would produce the world’s largest
dam-displaced population (500,000 – 1,200,000 people), even at the lowest
reservoir operating level nominally under consideration. Other Chinese
dams have forced major resettlements – for example, the Danjiangkou Dam
on the Han River (380,000), and the Sanmenxia Dam on the Yellow River
(320,000).1 Outside China, the governments of Egypt and Sudan
displaced 100,000 people to make way for the Aswan High Dam.
The Purpose of the CYJV Water Control Project Feasibility
Study
The executive summary of the Three Gorges Water Control
Project Feasibility Study describes the mandate of the CIPM Yangtze
Joint Venture (CYJV), sponsored by the Canadian International Development
Agency, as “to provide an impartial technical review to the Government
of China, to assist it in reaching a decision, and to form the basis for
securing funding from international institutions.”2 From reviewing
the report, it appears that the factions within the government of China
that commissioned the study had already reached the conclusion that they
wanted the dam, and that the report was to satisfy the second objective:
convincing international institutions to fund the project. This makes
its mandate inaccurate and its description as “impartial” questionable.
The CYJV report is remarkable in the way it strains to emphasize positive
aspects of the scheme. Most incredibly, CYJV lists resettlement as a benefit:
“resettlement construction and development would spur growth in the area
bordering the reservoir.”3 Among the benefits ascribed to the
Three Gorges Project is: to “encourage development of the region with
resettlement funds.”4 The CYJV steering committee* met six
times over the course of the study schedule. At the fourth meeting, the
international panel of experts decided that “due to data limitations on
the question of land availability for resettlement, resettlement feasibility
could not be fully demonstrated.”5 At the sixth and final meeting,
the steering committee decided that the terms of reference had been satisfied,
and concluded that from the point of view of resettlement the project
is feasible – but CYJV does not explain what convinced the panel of experts
to reverse their original conclusion. The following discussion refutes
the final conclusion reached by CYJV and the panel of experts that resettlement
is feasible.
| Dam | |
| Dam height (crest) | 185 metres (m) |
| Dam length | 2,150 m |
| Overflow Spillways (26 units) | 8m wide x 20m high |
| Submerged Spillways (27 units) | 7m wide x 9m high |
| Reservoir | |
| Normal Pool Level* (NPL) | 160m |
| Flood Control Level (FCL) | 140m |
| Maximum Flood Control Level (MFL) | 181m |
| Function | |
| Flood Control Storage | 31 x 109 cubic metres (m3) |
| Installed Hydropower | |
| Generating Capacity | 16,750 megawatts (MW) |
| Average Annual Output | 68.8 terawatt-hours (TWh) |
| Navigation Locks | Twin 5-stage flight locks |
| 20 m lift per stage | |
| *Normal Pool Level is the maximum height of the reservoir during the dry season |
|
Reservoir Operating Levels
The operating height of the reservoir largely determines
the magnitude of impacts due to flooding. The higher the level, the greater
the impacts, especially at Chongqing. CYJV recommends 160 metres above
sea level as the maximum normal pool level (NPL) because operating levels
higher than this would displace many more people: 465,000 if raised to
180 metres. Also, more of the city of Chongqing would be flooded. The
report warns: “Neither the economics nor the social impacts of this situation
would favour such a reservoir operating condition.”6 CYJV observes
that higher operating levels, including a higher flood control level (FCL),
would shift the fluctuating backwater reach** and its attendant sediment
deposition*** further upstream, thereby increasing the level of flooding
at Chongqing. Because of this, CYJV endorses a normal pool level no higher
than 160 metres and a flood control level of 140 metres. However, the
Canadian International Development Agency’s concluding statement with
respect to the study leaves open the possibility of raising operating
levels in the future:
Continuing studies of changing economic factors in China
and availability of new data could lead to consideration of slightly
modified operating levels.7
Expected Flood Levels in the Reservoir
The total number of people to be resettled and compensated
is related to the expected level and frequency of floods to be controlled
by the dam.* The CYJV-recommended project, with a normal pool level of
160 metres, would have a dam height of 185 metres. Flood waters would
be stored in the reservoir by filling to levels above the flood control
level (140 metres) and when the Yangtze’s flow exceeds a 50-year flood
– the maximum flood expected to occur once every 50 years – floodwaters
would be stored above the normal pool level (160 metres). When even heavier
floods occur, the reservoir would be allowed to rise up to the maximum
flood control operating level (MFL) of 181 metres; this level is expected
to be reached at a river discharge of 80,000 cubic metres per second (m3/s),
an event expected to occur once every thousand years (a 1000-year flood**).
These flood probabilities, which are used to set the lower limit for resettlement
sites, may well be overly optimistic.
The flood probability analysis is undoubtedly based on the
very long series of historical records for the Yangtze River which China
is fortunate to have. But the increase in flooding due to deforestation
over the past several decades makes simple calculations from the historical
record a poor guide to future flood probabilities. For example, a flood
almost as “improbable” as the scenario for the maximum operating level
at the Three Gorges Project was experienced in 1981, when the flow reached
72,000 m3/s. In all likelihood, the probability of a disastrous flood
has increased dramatically in recent years and may continue to increase
due to deforestation in the upstream catchment area.8
The Yangtze Valley Planning Office (YVPO) designed much of
the Chinese government’s program for the Three Gorges area. The YVPO plans
and the CYJV-recommended project differ in a number of ways, the main
difference being that the YVPO plan is less generous in identifying people
eligible for compensation and in providing for their livelihoods. It is
important to keep both plans in mind, since, now that the project has
been approved, events will likely evolve in the direction of the Chinese
proposal.
YVPO has defined the “relocation and requisition levels’*
along the banks of the Yangtze River using a one-criterion scheme based
on the 20-year flood probability. The river level corresponding to a 20-year
flood is not a horizontal line at a fixed elevation along the proposed
reservoir, but rather slopes upward from the dam to higher levels in the
backwater reach and tributaries. For most of the reservoir the 20-year
flood level is the same as the normal pool level (160 metres), but at
the upstream end of the reservoir and in the backwater reach it is higher.
Both YVPO and CYJV have calculated this value using a Chinese
method that considers a water flow of 56,700 m3/s rather than using the
international method, which would dictate using 72,000 m3/s – the flow
experienced during the flood of 1981. Using the former method means that
floods can be expected to occur with greater frequencies than calculations
for specific elevations indicate. Therefore more people deserve compensation
than YVPO and CYJV have identified.
CYJV lists YVPO’s definition of a requisition level as an
issue that “can be raised with regard to the YVPO methodology.”9
YVPO’s requisition levels are based on the 20-year flood level calculated
with the reservoir starting out at the flood control level (thereby only
taking into account flooding in the summer months). CYJV recommends instead
a standard based on the 20-year flood level with the winter and fall flood
probabilities calculated with the reservoir starting out at the normal
pool level of 160 metres. This would extend the requisition zone 131 kilometres
further upstream, thereby including more people in the compensation and
requisition estimates.
The CYJV-recommended project sets “requisition levels” below
which compensation would be paid for residences, farmland, factories,
and the like. For houses, this level corresponds either to the normal
pool level plus two metres10 or to the 20-year flood level,
whichever is higher. People living below these levels would be compensated
and moved to the resettlement sites located above 182 metres.
Overall, CYJV praises the YVPO plans. However, closer scrutiny
reveals that the plans are not as fair as CYJV leads one to believe. For
example, “the loss of the use of land that is flooded in summer but dry
in winter (below the natural 20-year flood line) is not included in the
compensation criteria.”11 The zone in question is described
by CYJV as:
An unquantified but perhaps substantial area that will
be permanently flooded with the reservoir but that is only seasonally
or inter-annually flooded under present conditions. This permanent flooding
will cause a permanent reduction in the economic activities carried
out in this area that will not be compensated.12
Not only would the affected farmers be unjustly deprived
of land, but the area as a whole would also lose a social function that
would not be replaced: this wide strip of land in question is presently
farmed during the winter when the river is low and when crops higher up
are not producing harvests. It provides wheat, barley, pulses and vegetables
for local consumption.
For the people living above the requisition level (those
who would remain in the reservoir area), CYJV assumes that the risk of
one flood in 20 years is acceptable for farms and houses, and the risk
of one flood in 100 years is acceptable for large factories. CYJV claims
that compensation would be awarded if flood damage occurs above the requisition
levels, but regardless of whether or not compensation would be forthcoming,
CYJV is expecting local people to accept a heavy burden of risk. And,
should the flood probability calculations prove wrong, the risks could
be even more daunting.
CYJV believes that the benefits experienced by the portion
of the population who are exposed to flood risk without the dam, and who
would be resettled to higher grounds with the dam, counterbalances the
added risk of flooding borne by people living between 162 and 182 metres
when heavy floods are held back in the reservoir. In short, CYJV concludes
that “the trade-off between the before and after situations is more or
less even.”13
YVPO’s calculations have resulted in an arbitrarily designated
requisition and compensation zone that not only fails to include all of
the reservoir but also fails to include the surrounding land that would
be subject to an increased risk of flooding. Sedimentation is expected
to raise the channel bed in the 120-kilometre reach upstream of the official
length of the reservoir. This would enlarge the area and number of people
at risk of flooding in future years.14 And even though YVPO
estimates that a 3-metre rise in flood levels at Chongqing would force
the relocation of some 90,000 people, it did not account for this in its
resettlement estimates.
CYJV estimates the reservoir would extend 498.6 kilometres
upstream for a normal pool level of 160 metres. CYJV’s estimates of reservoir
length result in requisition and compensation zones extended slightly
further upstream of the YVPO plans. However, CYJV’s zones are, like those
defined by YVPO, arbitrarily defined and well downstream of Chongqing
which would face increased flooding if the dam is built. For the 160-metre
scheme calculated by YVPO, the 5-year flood levels would rise by approximately
7 metres in some places along the reservoir, and by roughly 4 metres near
Chongqing, after 30 years. To calculate this, CYJV inexplicably uses the
5-year flood levels scenario rather than the 20-year flood levels which
are used for all other compensation and requisition calculations. Instead
of quantifying the magnitude of these potentially enormous impacts to
serve as an input for the decision on whether to build the dam, CYJV merely
states that:
Backwater levels affected by reservoir and backwater sedimentation
were not included in the [YVPO] assessment. Additional compensation
and resettlement resulting from higher sediment-caused backwater levels
are deferred to operation of the Three Gorges Project rather than to
its construction.15
In effect, CYJV has chosen to ignore the additional flooding
due to sedimentation.
Furthermore, CYJV failed to quantify either the effects of
backwater intrusion or sedimentation along the tributaries in the compensation
and resettlement estimates. For the CYJV-recommended scheme of NPL 160
metres, one-third of the reservoir area would consist of flooded tributaries
and their valleys. Sedimentation is expected at the confluence of the
tributaries (the point where they meet the mainstem of the river) and
within the backwater, and could have a particularly significant impact
along the Jialing River where it meets the Yangtze River at Chongqing.
In addition to the restricted eligibility for compensation
and relocation, and the likelihood that flood levels may be higher in
reality than assumed (especially in the backwater reach of the reservoir
and in the tributaries), the growth of the population in the reservoir
area during construction may be faster than YVPO assumed.* CYJV acknowledges
that:
Higher natural growth and migration rates, and a longer
resettlement period [mean that] the CYJV Recommended Scheme population
could be increased by an additional 100,000 persons.16
Governments Change Their Minds
Many precedents exist where internationally financed development
infrastructure has been used for much more damaging ends than originally
proposed to financing agencies and addressed in environmental impact studies.17
The World Bank’s internal policies (not any externally mandated restriction)
limit the consequences of non-compliance with loan agreement clauses on
the environment, resettlement and similar matters, to cutting off the
remaining funds for the particular loan in question. Predictably, motivation
to comply with such clauses decreases steadily as loan disbursements are
received, and disappears completely when disbursements have ended.
In the case of the Three Gorges Project, the Chinese government
could promise anything potential financiers might want to hear and then
simply change its water management policies once it is no longer constrained
by the need to gain approval for international financing. For example,
promises could be made to operate the dam at normal pool level of 160
metres, as recommended by CYJV, and to handsomely compensate all displaced
persons. However, once the dam is complete, nothing prevents the Chinese
government from changing its mind.
For example, if funds were to prove insufficient to meet
cost overruns, which has traditionally been the case for Chinese dam construction
projects such as the Gezhouba Dam, and which cost over twice the amount
initially estimated, or even if funds were insufficient to meet the officially
approved budget, the Chinese government could decide to discontinue the
long-term programs of subsidies and assistance proposed for the reservoir
region so that construction of the dam could proceed.*
If the Chinese government wanted to raise the dam’s operating
levels in order to generate more electricity, the same physical structure
could technically be operated with a normal pool level up to 20 metres
higher than proposed. Despite the fact that CYJV was unable to confirm
the feasibility of resettlement at higher NPLs, one stroke of a pen and
one turn of a valve could raise the normal pool level to 180 metres, and
as a result, an additional 465,000 people would be displaced with little
chance of receiving adequate assistance.
Raising the normal pool level from 160 to 170 metres (and
the flood control level from 140 to 145 metres) would generate an additional
800 megawatts of firm energy; however, CYJV states that the value of the
power is more than offset by the cost of resettling an additional 260,000
people. Unlike most of the costs of dam building, there are no economies
of scale as the number of people displaced increases. CYJV observes that
“in fact, experience shows that diseconomies are more likely to occur.”18
CYJV assumes that the additional displaced people would receive the relatively
expensive benefits package they have proposed. But the Chinese government
could easily raise the water level, thereby cashing in on the power benefits
while essentially leaving the people to fend for themselves.
China’s own feasibility study, submitted to the State Council
on 7 March 1989, recommends a normal pool level of 175 metres.19*
This level corresponds to a flood control operating level of 145 metres.
CYJV warns that operating the dam at a “FCL greater than 145 m [metres]
could raise the 100-year flood stage at Chongqing, after about 100 years
of Three Gorges Project operation, to around 200 m;”20 42 metres
higher than the natural water level in Chongqing.
There are a number of strong indications that the Chinese
government has plans to fill the reservoir in two stages, going first
to the CYJV-recommended normal pool level of 160 metres, followed by filling
to either the normal pool level of 175 or 180 metres. A 1987 inundation
survey was conducted for a normal pool level (NPL) of 175 metres that
“envisages a two stage reservoir filling and related resettlement relocation
schedule.”21 Surveys prior to 1987 included even higher NPLs
of 180 and 220 metres. Should the Chinese government wish to raise operating
levels beyond the limits of the presently proposed structure, it could
add height to the dam, as is currently proposed for the Danjiangkou Dam
on the Han River (a Yangtze tributary).22
“Draft” Plans
Considering plans as eternally in “draft” form is a common
practice in many countries, such as Brazil, where the preliminary nature
of plans can be used to justify secrecy, and to deflect criticism by alleging
that whatever plan is being questioned has changed or is changing. For
the Three Gorges Project, “draft” resettlement plans have been under preparation
since 1985, with the most recent version prepared in 1987 “to accommodate
the Chinese NPL 175 scheme.”23 CYJV states that these plans
are “still under review by Chinese authorities and are considered working
documents.”24 Such plans could quite easily remain in “draft”
status while they are in fact carried out and the dam becomes a concrete
and steel reality.
As for construction of the project, China has a tradition
of changing plans as construction proceeds, despite efforts to curtail
the practice. Major dams have been built using the traditional system
of san bian (three sides); simultaneously surveying, designing, and building.25
As examples, the Danjiangkou and Gezhouba dams were both built using this
system: both projects had to be halted for two years during construction
due to inadequate planning,26 and their designs were frequently
changed throughout the entire construction period.
In the case of the Three Gorges Project, if implementation
were to proceed on the recommended scheme of NPL 160 metres, it would
be quite a normal practice for plans to evolve toward the more grandiose
“draft” proposals for a higher normal pool level or a larger dam. These
draft plans would displace more people (especially in Chongqing) and cause
even more disruption to local economies and the environment.
The Record of Resettlement
CYJV extols China’s new “resettlement with development” policy
as “among the best in the world.”27 However, China’s record
of resettlement is not good, and speaks far louder than a mere announcement
of new government policy. Even state planning officials, Tian Fang and
Lin Fatang, who tout the virtues of the dam and the possibility of “mobilizing
the population” to turn the resettlement areas into regions of prosperity,
admit that past resettlements have been plagued with “mistakes such as
uncoordinated management, duplicate development, wasteful use of volunteer
labour, and limited funds.”28
In the case of the Danjiangkou Dam, CYJV states that “funds
were totally inadequate even for the reconstruction of infrastructure,
including housing, at the time of removal. Significant funds for development
purposes only became available to relocatees in Yunxian county in 1984,
over ten years after resettlement had been completed and even these funds
may still be inadequate.”29
In general, official plans rarely correspond to reality.
For example, in the reservoir region, government regulations have prohibited
further development below 172 metres, but construction in the doomed cities
(below 172 metres) proceeds as usual. CYJV refers to this as “uncontrolled
building” and notes that “while the exercise of ‘master planning’ is taking
place, land use planning controls are not very strong.”30
From this, it is not unreasonable to surmise that the rosy
assessment given in the resettlement master plans may never become reality.
CYJV acknowledges these doubts in various sections of their study, but
these doubts are not reflected in the feasibility study’s overall conclusions,
which underwrite the Chinese government’s plans as adequate.
Land Availability and Quality
In densely populated countries, the most intractable problem
associated with dam resettlement schemes has been that land of equivalent
quality to the land lost is simply unavailable.* In the case of the Three
Gorges Project, the idea that equivalent quality land should be offered
to replace the land lost is not even raised as an issue.
The resettlement plans call for relocating people within
the same townships (xiangs), plus a few additional townships adjacent
to those on the reservoir shoreline. Within the 600-kilometre reservoir,
many of the displaced rural people would be moved to the eastern end of
the region, where YVPO identifies most of the “claimable land.” (Claimable
land is presently unoccupied land in the zones slated for resettlement
that is considered by CYJV to be farmable.)
CYJV’s conclusions that “the Chinese plans show that sufficient
land resources have been identified to satisfy rural resettlement needs
for all affected counties”31 are doubtful for numerous reasons.
With a farmland per capita of 0.067 hectares (less than one-fifth of an
acre), there are already too many people farming in the area surrounding
the reservoir; 30 percent are considered by the government to be “surplus”
due to the contract responsibility system* and agricultural modernization.32
To increase the amount of “claimable land”, CYJV boosted the number of
host townships originally proposed by YVPO,** as recommended by the CYJV
feasibility study steering committee. But this does not solve the problem
for one simple reason: the “claimable land” in the area is unoccupied
because the local population has found it to be not worth farming – the
soil is poor and the land is too steep to cultivate. Incredibly, CYJV’s
analysis of land availability assumes that a hectare of inundated land
can be replaced by a hectare of land elsewhere: “preliminary screening
of land replacement potential was conducted assuming a 1:1 ratio of available
to inundated land.”33 This “preliminary screening” was the
only one done and is the basis for the CYJV conclusion that sufficient
“claimable” land is available. In other words, replacement land is considered
to be the same quality as the inundated land – a wholly indefensible premise.
In addition to this, CYJV’s acceptance of the Chinese expectations for
land is unwarranted because:
- The Chinese government has not clearly defined basic
characteristics such as altitude, slope and soil type which are necessary
for identifying the agricultural potential of unused land. - CYJV examined the “claimable” land within the 185 to
800 metre elevation band and found only 68 percent as much available
land as the Chinese government had asserted.
Later on in the study, CYJV concludes that “taking into account
qualitative factors that might increase or decrease the eventual claimable
land resource, the Three Gorges Project survey [Chinese government] results
are seen to provide a conservative indication of resource potential.”34
CYJV does not specify what qualitative factors led to its remarkable conclusion.
This author believes the quantitative results on land availability and
quality support the opposite conclusion, namely that the Chinese governments’
expectations are overly optimistic.
CYJV only examined land below 800 metres elevation, but the
Chinese proposals include plans for resettlement above this mark where
over 50 percent of the total “claimable” land is located. Because the
number of people to be resettled may be substantially more than officially
expected, the Chinese are likely to turn to land above the 800-metre limit
when resettlement is actually under way. Unfortunately for the settlers
assigned to this zone, the agricultural viability CYJV foresees for lower
elevations would not apply.
According to CYJV, apples, pears, apricots, plums and potentially
mandarins can be grown, and animal husbandry practised, up to 800 metres
elevation. Citrus orchards, except for mandarins, are planned for below
600 metres elevation. Above 800 metres, agriculture is restricted to potatoes,
some cereals, and mulberries for silkworm production.
For each crop, the land is considered to be suitable up to
a fixed cutoff elevation, and for most citrus varieties this cutoff is
at 600 metres because of risk of frost. However, climatic suitability
does not, in reality, occur in an all-or-nothing fashion at a given elevation.
Rather, production (or frost risk) becomes gradually worse over a wide
range of elevations, including the zones defined as suitable. Because
land availability increases with elevation, a disproportionate share of
the land within each crop’s defined zone of suitability would be located
near the upper limit of the crop’s elevation range. Because of this, the
mean crop yields used in the CYJV calculations are likely to be overly
optimistic for the land that would actually be planted by resettled farmers
within each zone.
Citrus orchards are described by CYJV as the major component
in Chinese agricultural plans for the resettlement areas. Plans envisage
both intensifying production (by planting citrus) on already cultivated
land and bringing uncultivated land into production. But since citrus
cannot be grown within the top 200 metres of the elevation range considered
by CYJV, as well as on all land above this zone, a large fraction of the
farmers would not benefit from the economic potential of the citrus plans.
At the lowest elevations considered for citrus the risk of
flooding is the key factor. Like risk of frost at the upper elevations,
this can be expected to have a severe impact on the orchards. CYJV considers
flooding acceptable for orchards if it does not occur with a frequency
greater than once every five years.35 Under such a flooding
regime, the citrus orchards would have to regrow at an unusual pace indeed
if they were to remain profitable!
Within the 400 to 800-metre elevation range, the available
parcels of land get smaller and smaller as the land improves at lower
elevations. The average for the entire elevation range considered by CYJV
(up to 800 metres) is a minuscule one hectare (two and a half acres).
To farm these plots, villages would have to be divided and dispersed,
which would essentially pulverize the existing social structure of villages.*
Given this situation, it is difficult to imagine how CYJV intends to satisfy
its 14 criteria (Appendix A), one of which states that “opportunities
for resettling people in groups and communities should be provided.”36
Minority Areas
In the semi-arid western regions near China’s border with
the Soviet Union, in Tibet, or in the tropical areas near the Burmese
and Lao borders, settlement projects have been under way as part of the
central government’s effort to populate the areas with Hans, China’s racial
and cultural majority.37 If the plans to reclaim the steep
and relatively high-altitude land that makes up most of the claimable
category, and to intensify production on already cultivated land, were
to prove less successful or more expensive than expected, the temptation
would be strong to look for alternative relocation sites further from
the Three Gorges region.
In this case, there is a possibility that displaced farmers
(all of whom belong to the Han majority) could be deported to distant
settlement areas presently populated by minority groups. CYJV does not
mention this in its report, which is not surprising, because the expressed
purpose of the report is to justify the project to international funding
agencies. If CYJV were to mention such a scheme as a possibility, it would
conflict with the World Bank’s policy on tribal peoples38 and
jeopardize future World Bank involvement.
Nonpersons
CYJV fails to mention that the Chinese government apparently
has no intention of providing resettlement benefits to “nonpersons.” Of
urban dwellers, 10 to 30 percent are illegal migrants to the cities (approximately
27,000 to 80,600 people) and therefore are “not officially registered
as resident in urban areas.”39 The YVPO surveys of urban areas
conducted to estimate resettlement costs did not include these people.
CYJV includes this “floating population” in its estimates but uses the
most conservative approximation of 10 percent of urban dwellers rather
than the more logical midpoint of the range.
The fate of these nonpersons has been a point of contention
in China’s negotiations with the World Bank. The Chinese government has
been averse to providing benefits to these people because it would reward
illegal behaviour.40 Recently, however, the government has
softened its position somewhat. The Chinese panel of experts (under China’s
Leading Group for Three Gorges Project Studies), together with YVPO, now
define the affected population as including “the portion of the floating
population that has resided in county seats and towns for more than a
year.”41 No housing is planned for these people, and, clearly,
some of the “floating population” is still excluded from the plans. In
addition to the illegal migrants, the government does not officially recognize
some whole towns as urban areas, meaning that the residents have no rights
to relocation or to industrial jobs.
CYJV appears to endorse the Chinese government’s policy of
treating many migrants as nonpersons: “CYJV assumed that migrants would
not be entitled to resettlement compensation and hence would be discouraged
from the zone to be resettled” after resettlement begins.42
Given that the Chinese government would prefer to provide no resettlement
benefits to the floating population, and given that these nonpersons do
not even officially exist, it would seem appropriate that some mechanism
be identified to ensure that the true size and identity of the floating
population is determined, and that these people would not simply be ignored
if international financing is obtained and resettlement started.
Rural to Urban Migration Policy
Resettling farmers is much more difficult than moving city
people because farming requires land – a finite resource that is fully
utilized in the Three Gorges region, and cannot simply be created anew
regardless of the amount of funds devoted to that purpose. Therefore,
if rural resettlement were to prove unsuccessful, the government has the
option of resettling more people in urban areas than originally planned.
In the 1950s and 1960s, millions of people were forcibly
relocated from the cities to the countryside. Since that time, government
restrictions on internal migration, with people legally tied to their
work unit (dan wei), have prevented many rural people from responding
to the lure of bright city lights. Were these restrictions lifted, some
of the “surplus” rural population in the Three Gorges region might willingly
move into cities if given the chance.
However, the problem with expanding urban resettlement is
that creating factory jobs is about two to three times more expensive
per capita than rural resettlement.* Therefore, to allow a greater share
of urban resettlement, the budget allocation to resettlement would have
to be substantially augmented. But the CYJV recommends the opposite: that
“measures will have to be adopted and enforced to prevent migration to
urban areas below the requisition line.”43 These measures seek
to prevent migration within the project area from the countryside to the
cities, where new arrivals to the project area would acquire rights to
resettlement with urban jobs.
Development Proposals for the Reservoir Region
The Chinese “resettlement with development” policy, as stated
by CYJV, includes development assistance to the resettlement areas and
favourable prices for power (not necessarily from the Three Gorges Project)
to factories in the area. Official policy44 declares that the
Three Gorges region would receive priority for both mining and industrial
investments. However, CYJV states that “all large scale mining projects
are controlled entirely by the State, therefore, future development must
take into account alternative investments elsewhere in the country. In
this regard, the reservoir region is unlikely to receive special attention
in the foreseeable future unless special efforts are made to promote these
resources.”45 Apparently, the authors of the CYJV study are
hinting that official rhetoric on diverting investments from more promising
sites is not likely to be translated into tangible benefits for the displaced
population. This suspicion is reinforced by a caveat in the official policy
decision of the Central Committee of the Communist Party that identified
Three Gorges as a special priority:
Normal expenditures from other channels should not decrease
due to the occurrence of resettlement investment. Instead, funds should
be raised from all possible means to bring into being a set of industrial
and mining enterprises.46
Consultation of the Local Population
CYJV refers to public consultation in various sections of
the feasibility study. For example, one of CYJV’s 14 criteria (Appendix
A) for “successful resettlement” states that:
The resettlement plans should have broad-based popular
acceptance and the affected population should be consulted.47
In addition, the international panel of experts lists as
a “factor to be considered” that:
It is especially important for the success of the Three Gorges Project
resettlement program that not only the population to be resettled but
also the host population are convinced that they will benefit from the
Project.48
CYJV provides no evidence that the local populations have
had any legitimate input to the project planning and decision making,
much less that they are “convinced” of the benefits. Moreover, CYJV’s
statement that “the expectations and concerns of the host population are
not so well known”49 suggests that the host population may
not have been consulted at all.
The reservoir area as surveyed is made up of 610 townships
(xiangs). Approximately 500 townships, all but a few of which are in the
surveyed area, would receive displaced farmers according to plans for
the CYJV-recommended scheme. The CYJV team visited China in March and
April 1988 for an unspecified length of time, during which 43 townships
(xiangs), a mere 10 percent of the townships which would receive displaced
farmers, were subjected to “an independent check, using aerial photo interpretation
techniques supported by field verification.”50 The study does
not indicate how many of the 43 townships they visited nor how much time
was devoted to their visits. This 10 percent sample is described by CYJV
as “representing typical conditions throughout the reservoir area.”51
While this may be true for physical factors, which can be checked from
maps and aerial photos, these methods cannot guarantee representativeness
from the standpoint of local consultation and support for the project.
Almost universally, governments requesting international financing for
projects tend to show visiting delegations carefully selected “success
stories.” Nothing is said of what steps might have been taken to avoid
this problem.
CYJV states that “at all the sites visited, the local people
were aware of the pending decision concerning the Three Gorges Project”
and “the local leaders have been and will continue to be involved in the
planning of resettlement within their own communities.”52 The
“local leaders” CYJV claims are involved in the resettlement planning
probably refer to Communist Party cadres (ganbus). Cadres are not elected
representatives – they represent the interests of the central government
rather than the local people. Under the repressive political regime in
China, any local people critical of the Three Gorges Project could hardly
be expected to voice their opinions. There are no nongovernmental organizations
or grassroots movements, such as the committees of “oustees” threatened
by India’s planned Narmada Dams, who would be in a position to question
official decisions.
The author’s personal impressions from an eight-day visit
to the reservoir region in 1987 do not confirm CYJV’s assertion that the
local population has been widely consulted. Those people this author met
who were aware of the proposed dam certainly did not share CYJV’s view
that resettlement “offers an opportunity for planned regional development
that can add to the benefits of the Three Gorges Project.”53
Secrecy, Irreversibility, and Bias
The inadequacy of the CYJV feasibility study demonstrates
the need for public scrutiny and debate about not only the Three Gorges
Project, but all development projects. The secrecy that has surrounded
both China’s drafting of the Three Gorges proposal and Canada’s feasibility
study has denied these efforts much valuable (and free) input from people
beyond the confines of the institutions entrusted with the studies.54
Secrecy results in important factors being overlooked in
the various planning and decision-making stages, and also prevents correction
of omissions or distortions before the project becomes “irreversible.”
In fact, the presentation of development plans as “irreversible” is often
a deliberate strategy to avert more rigorous discussions of projects which,
in cases such as the Three Gorges Project, would likely be rejected if
the true costs and benefits were brought to light.* The CYJV feasibility
study’s language indicates that the authors accept as a foregone conclusion
that the Three Gorges Dam will be built along with other grandiose megaprojects
affecting the Yangtze River, such as China’s interbasin water transfer
schemes. Specifically referring to these developments, CYJV states flatly
that “the Yangtze watershed will be [author’s emphasis] subjected to many
human interventions over the next several decades.”55
The CYJV study team appears not to have fulfilled its role
at least theoretically included in its mandate which was to provide input
to the decision on whether or not to build the Three Gorges Dam.
Sources and Further Commentary
*Normal Pool Level is the maximum height of the reservoir
during the dry season.
*The steering committee is comprised of two representatives
from China’s Ministry of Water Resources and Electric Power (MWREP), one
from the Canadian International Development Agency, and one from the World
Bank. The international panel of experts were appointed by MWREP and the
World Bank to advise the steering committee.
*The backwater reach of the river is the length of the river
upstream of the reservoir whose level fluctuates depending on operating
levels of the dam.
**Sediment disposition (or sedimentation) is the process
of sediment accumulation in the river. Over time, sediment deposition
tends to form a delta in the upstream end of the reservoir which reduces
the reservoir’s storage capacity and also extends the fluctuating backwater
further and further upstream.
***Some people that already live above the designated relocation
level may lose farmland to the reservoir that would warrant compensation.
*The flood of 1870, with a historical maximum flow of 110,000
m 3/s, exceeds the 1000-year flood used by CYJV. The 1870 flood swept
away the Zhang Fei Temple (opposite Yunyang) that had been standing since
the Three Kingdoms Period (AD 220-265). Deforestation since 1870 has undoubtedly
increased the danger of major floods such as this one.
*The Yangtze Valley Planning Office defines the relocation
level as the elevation mark along the reservoir above which resettlement
sites are located. Also, it defines the requisition level as the level
below which various forms of compensation would be given.
*YVPO assumes a 1%/year population growth, a migration rate
to the cities of 1.5%/year and to the towns of 0.5%/year.
*CYJV estimates resettlement costs to be roughly one-third
of the total budget for the CYJV-recommended project.
*Editor’s Note: A technical description of the Three Gorges
Dam, written by the project’s chief engineer and an official of China’s
Ministry of Energy, and published in Water Power & Dam Construction
in February 1993, confirmed that the normal pool level is to be 175 metres.
*In the case of the Narmada Project in India, which is widely
viewed as one of the world’s worst dam-building disasters, the lack of
replacement land was cited by a World Bank-commissioned independent review,
and supported its recommendation that the World Bank pull out of the project
until comprehensive resettlement and environment studies could be completed.
*The contract responsibility system was instituted in 1981
and motivated an increase in agricultural output by allowing farmers to
market some of their produce.
**Host township is the term proponents use for those townships
that would not be flooded by the reservoir but would receive an influx
of displaced people.
*In India, where villagers threatened by displacement are
permitted to express their views, one of their first demands is to prevent
fragmentation of village units. This continues to be a major focus of
resistance to the Narmada dams in India.
*For example, for the NPL 160 metres scenario, CYJV calculates
that agricultural jobs on new land will cost 6,491 yuan/job while jobs
in new factories will cost 16,400 yuan/job.
This is the case for Brazil’s infamous Balbina Dam, which
was built on the Uatuma River in 1987. Before construction began, the
government continually referred to the project as “irreversible,” yet
the costs of the dam so greatly exceeded its benefits that money could
hve been saved by abandoning the scheme even after the river had been
blocked and the reservoir was partially full.