Murky practices mar bidding for Three Gorges cleanup contracts

(October 31, 2001) Hundreds of factories, hospitals and other buildings containing hazardous materials are to be dismantled and their sites scrubbed clean before the Three Gorges dam reservoir is filled to the 135-metre level in 2003. But as the deadline looms, concern is mounting that time is too short for an environmental cleanup of this magnitude.

Study on Methods of Reservoir Induced Seismicity Prediction of the Three Gorges Reservoir”

(October 17, 2008) Based on the analysis of seismogeological background, the Three Gorges Reservoir area is divided into 31 units according to different combined conditions of induced earthquake, together with 8 influencing factors, to give the prediction on probability and magnitude of RIS by adopting statistical prediction model, fuzzy mathematics and gray system model as well as artificial neural network model respectively.

Chilean Patagonia Without Dams

(October 16, 2008) A leading Chilean environmental activist, Juan Pablo Orrego will share his analysis of hydroelectric mega-projects proposed for Chilean Patagonia, and will also explore the broader context of economic and political power that shapes energy policy in Chile and contrains opportunities for meaningful democratic process on environmental questions.